> Markdown version of [/jobs/ext/2518684-asst-construction-manager-owner-s-representative-data-center-construction](https://www.wearedevelopers.com/jobs/ext/2518684-asst-construction-manager-owner-s-representative-data-center-construction). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Asst. Construction Manager (Owner's Representative) - Data Center Construction - **Company:** KALCON LLC - **Location:** Abernathy, TX, United States - **Experience:** Experienced - **Salary:** $100,000.0 - $150,000.0 - **Contract:** Permanent contract - **Skills:** Microsoft Word, Microsoft Excel, Data Centers, Microsoft PowerPoint - **Published:** August 3, 2026 - **Apply:** https://www.indeed.com/viewjob?jk=b046d47aa5691ad9 ## About the Role * Bachelor's degree in Construction Management, Electrical Engineering, or related field * 3-5 years of commercial/industrial construction or mission critical project experience (Data Center, Semiconductor, Labs, or similar)-critical project experience (Data Center, Semiconductor, Labs, or similar) * Strong proficiency with MS Word, Excel, PowerPoint, and Project * PMP, CCM, or PE license is a plus * Excellent analytical, communication, and presentation skills * Ability to proactively identify issues and drive solutions across multiple stakeholders & teams-functional teams ## Description Seeking a Assistant Construction Manager to coordinate, manage, and report on construction activities for mission-critical facilities., * Lead daily on-site construction oversight for civil, structural, architectural, and MEP activities across multiple buildings on a data center campus. * Review and validate the GC's full construction schedule, including monthly forecasts, CPM updates, and detailed look-ahead plans. * Participate in and/or lead weekly schedule coordination meetings with the GC, subcontractors, commissioning teams, and direct vendors. * Manage OFCI equipment lifecycle including scheduling, logistics planning, delivery oversight, inspection, and installation tracking. * Coordinate commissioning schedules and ensure alignment with construction progress and equipment readiness. * Manage owner-directed vendor schedules (IT, roofing consultant, geotechnical services, third-party inspectors, etc.). * Oversee customer fit-out scheduling and ensure alignment between base-build turnover and tenant infrastructure requirements. * Support GMP buyout review, including scope validation, cost analysis, and recommendations to ownership. * Review and analyze value-engineering proposals to maintain performance and reliability of mission-critical systems. * Review and approve change orders, assessing cost impact, scope accuracy, and documentation quality. * Validate monthly pay applications against work in place, contract values, and schedule progress. * Provide proactive recommendations for cost avoidance and risk reduction throughout construction. * Conduct daily site walks, verifying quality, installation accuracy, workmanship, and compliance with specifications. * Coordinate facility operations activities including MOPs, utility shutdowns, notifications, and operational impacts * Track weekly progress and deliver accurate reporting to owner leadership, including forecasting and risk analysis. * Manage OFCI equipment receiving, verification, and handoff for installation readiness. * Lead or support weekly OAC meetings, track action items, and maintain accurate meeting documentation. * Process and manage project documentation including change orders, pay applications, RFIs, submittals, and logs * Oversee project closeout including financial reconciliation, punchlist management, O&M turnover, training, and handoff to operations. * Coordinate post-design construction administration, including design clarifications, updates, and integration of customer fit-out packages. * Evaluate design changes for cost, schedule, constructability, and operational impact. * Manage overall permitting efforts, coordinate with authorities having jurisdiction (AHJ), and oversee inspection and certificate-of-occupancy processes. * Maintain consistent communication with senior management, contractor leadership, vendors, and operations teams to ensure transparency and timely issue resolutio * Utilize modern project management tools and technology to support documentation, tracking, field coordination, and reporting. ## Related Videos - [What makes Cybersecurity different for critical infrastructure?](https://www.wearedevelopers.com/videos/571-what-makes-cybersecurity-different-for-critical-infrastructure) - [The Sustainability Race: AI's Promises, Pitfalls and Potential](https://www.wearedevelopers.com/videos/100155-the-sustainability-race-ai-s-promises-pitfalls-and-potential) - [In-depth .NET Azure Functions: Isolated mode, performance and durable AI agents](https://www.wearedevelopers.com/videos/100207-in-depth-net-azure-functions-isolated-mode-performance-and-durable-ai-agents) - [Developing the Rich Text Editor for DeepL.com](https://www.wearedevelopers.com/videos/1172-developing-the-rich-text-editor-for-deepl-com) - [Building the Nervous System of AI - Michael Kagan (NVIDIA)](https://www.wearedevelopers.com/videos/2133-building-the-nervous-system-of-ai-michael-kagan-nvidia) - [From Syntax to Singularity: AI’s Impact on Developer Roles](https://www.wearedevelopers.com/videos/900-from-syntax-to-singularity-ai-s-impact-on-developer-roles) ## Related Articles - [What Makes WeAreDevelopers World Congress Different From Every Other Tech Event?](https://www.wearedevelopers.com/magazine/701-what-makes-wearedevelopers-world-congress-different-from-every-other-tech-event) - [Why Attend a Developer Event in 2026?](https://www.wearedevelopers.com/magazine/688-why-attend-a-developer-event-in-2026) - [Best US AI Conferences for CTOs in 2026: Build vs. Buy, Vendor Evaluation, and Peer Intelligence](https://www.wearedevelopers.com/magazine/736-best-us-ai-conferences-for-ctos-in-2026-build-vs-buy-vendor-evaluation-and-peer-intelligence) - [Top Must-Visit Developer Conferences in the US in 2026](https://www.wearedevelopers.com/magazine/679-top-must-visit-developer-conferences-in-the-us-in-2026) - [What Are The Top Skills Required For Azure Developers?](https://www.wearedevelopers.com/magazine/77-what-are-the-top-skills-required-for-azure-developers) - [Why and How to Sponsor Developer Events](https://www.wearedevelopers.com/magazine/686-why-and-how-to-sponsor-developer-events)