> Markdown version of [/jobs/ext/2526844-director-power-utilization-and-infrastructure-efficiency](https://www.wearedevelopers.com/jobs/ext/2526844-director-power-utilization-and-infrastructure-efficiency). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Director, Power Utilization and Infrastructure Efficiency - **Company:** Facebook Inc. - **Location:** Menlo Park, CA, United States - **Experience:** Expert - **Contract:** Permanent contract - **Skills:** Cloud Computing, Data Centers, Linear Programming, Reliability Engineering, Software Engineering, Information Technology, Optimization Algorithms, Data Analytics, Data Management - **Published:** August 11, 2026 - **Apply:** https://www.jobmonkeyjobs.com/career/27923232/Director-Power-Utilization-Infrastructure-Efficiency-California-Menlo-Park-7418 ## About the Role * 12+ years of experience in software engineering, infrastructure systems, operations research, data science, capacity planning, data center infrastructure, power systems, or a related technical field * 8+ years of people management experience, including experience managing managers or multidisciplinary technical teams * Experience leading technical organizations that build production systems, data platforms, forecasting models, optimization systems, or infrastructure planning tools * Experience applying modeling, optimization, simulation, forecasting, or statistical methods to large-scale operational or infrastructure problems * Experience partnering across engineering, operations, finance, planning, and program management teams to deliver measurable business and infrastructure outcomes * Experience setting strategy, defining roadmaps, and driving execution across multiple teams or workstreams * Communication experience influencing senior technical and business stakeholders on complex infrastructure tradeoffs, * Experience with hyperscale data center infrastructure, power capacity, energy systems, capacity planning, supply chain planning, or fulfillment systems * Experience with optimization techniques such as linear programming, mixed-integer optimization, stochastic modeling, simulation, queuing models, or reliability modeling * Experience building systems that connect predictive models to operational decision-making workflows * Experience leading teams that include software engineers, applied scientists, operations research scientists, data scientists, and technical program managers * Experience with infrastructure cost modeling, utilization optimization, reliability risk management, or large-scale CapEx/Opex tradeoff decisions * Advanced degree or equivalent experience in Computer Science, Operations Research, Industrial Engineering, Electrical Engineering, Statistics, Applied Mathematics, or a related technical field * Experience operating at Director or Senior Director scope in a large-scale infrastructure, cloud, data center, or platform organization ## Description Meta is seeking a Director, Power Utilization and Infrastructure Efficiency to lead a multidisciplinary organization focused on maximizing the utilization, reliability, and cost efficiency of power across Meta's data center infrastructure. This leader will build and scale teams across software engineering, operations research, research science, and technical program management to develop models, systems, and programs that improve how Meta plans, allocates, and uses power at global infrastructure scale.This role will own the strategy and execution for data-driven power utilization across the data center fleet, including power consumption modeling, utilization and reliability forecasting, optimization systems, and integration with fulfillment and capacity planning systems. The role will also lead infrastructure efficiency programs that improve end-to-end cycle time, utilization, reliability, and cost across Meta's infrastructure supply and fulfillment ecosystem. Director, Power Utilization and Infrastructure Efficiency Responsibilities: * research scientists, and technical program managers focused on power utilization, reliability modeling, and infrastructure efficiency. * Define the long-term strategy, roadmap, and operating model for data-driven power planning and utilization across Meta's data center infrastructure. * Build data models that represent power consumption, constraints, utilization, and reliability across data centers, capacity planning systems, and fulfillment workflows. * Develop mathematical, statistical, and simulation-based models to predict power utilization, demand, risk, reliability, and available headroom across the fleet. * Build production systems that use model outputs to inform fulfillment decisions and improve power allocation, infrastructure readiness, and capacity utilization. * Partner with data center engineering, capacity planning, supply chain, finance, hardware, network, and infrastructure operations teams to translate power insights into execution plans. * Lead efficiency programs that improve end-to-end infrastructure metrics, including cycle time, utilization, cost, reliability, and operational throughput. * Establish metrics, review mechanisms, and decision systems that help Meta make tradeoffs across power availability, reliability, capacity delivery, and business demand. * Develop technical and organizational leaders, including managers and senior individual contributors, and build a durable leadership bench for a growing area of infrastructure investment. ## Related Videos - [Green Cloud Computing](https://www.wearedevelopers.com/videos/592-green-cloud-computing) - [The Sustainability Race: AI's Promises, Pitfalls and Potential](https://www.wearedevelopers.com/videos/100155-the-sustainability-race-ai-s-promises-pitfalls-and-potential) - [PySpark - Combining Machine Learning & Big Data](https://www.wearedevelopers.com/videos/44-pyspark-combining-machine-learning-big-data) - [From Messy Queries to Scalable Systems - How Data Engineering actually works](https://www.wearedevelopers.com/videos/100203-from-messy-queries-to-scalable-systems-how-data-engineering-actually-works) - [Building the Nervous System of AI - Michael Kagan (NVIDIA)](https://www.wearedevelopers.com/videos/2133-building-the-nervous-system-of-ai-michael-kagan-nvidia) - [Shipping Faster with Less: Render on Cloud Hosting, AI Workloads, and the Future of DevOps](https://www.wearedevelopers.com/videos/1894-shipping-faster-with-less-render-on-cloud-hosting-ai-workloads-and-the-future-of-devops) ## Related Articles - [The Best X (Twitter) Accounts for Developers](https://www.wearedevelopers.com/magazine/294-the-best-x-twitter-accounts-for-developers) - [How Much FAANG Companies Actually Pay Software Engineers in 2025](https://www.wearedevelopers.com/magazine/230-how-much-faang-companies-actually-pay-software-engineers-in-2025) - [How We Built a Worry-Free System That Runs for 10+ Years – And What We’d Do Again](https://www.wearedevelopers.com/magazine/751-how-we-built-a-worry-free-system-that-runs-for-10-years-and-what-we-d-do-again) - [Highest Paying Tech Companies for Developers](https://www.wearedevelopers.com/magazine/220-highest-paying-tech-companies-for-developers) - [From developer to manager – what does it take to become an engineering manager?](https://www.wearedevelopers.com/magazine/42-from-developer-to-manager-what-does-it-take-to-become-an-engineering-manager) - [Highest Paying Tech Companies in Europe](https://www.wearedevelopers.com/magazine/162-highest-paying-tech-companies-in-europe)