> Markdown version of [/jobs/ext/2753161-plm-manufacturing-systems-engineer](https://www.wearedevelopers.com/jobs/ext/2753161-plm-manufacturing-systems-engineer). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # PLM & Manufacturing Systems Engineer - **Company:** Parallel Systems - **Location:** Los Angeles, United States - **Experience:** Expert - **Salary:** $150,000.0 - $190,000.0 - **Contract:** Permanent contract - **Skills:** .NET Framework, Computer-Aided Design, Application Programming Interfaces (APIs), Backup Devices, C Sharp (Programming Language), Configuration Management, Computer Engineering, System Configuration, SolidWorks (CAD), Datacards, Extract Transform Load (ETL), Python (Programming Language), Windows Servers, Single Sign-On, SQL Databases, Systems Integration, Virtualization Technology, Backup and Restore, XML-RPC, Scripting, Odoo, Information Technology, Build Process, Software Version Control - **Published:** September 6, 2026 - **Apply:** https://startup.jobs/plm-pdm-systems-architect-parallel-systems-company-9929721 ## About the Role * 5+ years administering PDM or PLM systems in a hardware engineering or manufacturing environment. * Deep hands-on SOLIDWORKS PDM Professional administration, including workflow, data card, permission design, and Dispatch. * Demonstrated ownership of an engineering release and change control process, not only the system that hosts it. * Working knowledge of ERP/MRP manufacturing data - item masters, BOMs, and routings - and how engineering data must land in it. * Scripting or light development ability sufficient to build and maintain system integrations, such as Python, C#/.NET, or SQL, with comfort working against REST or XML-RPC APIs. * Experience working directly with engineers and production staff to translate process requirements into system configuration. Preferred Qualifications: * Hands-on experience with Odoo, or with another ERP/MRP implementation, integration, or migration. * Experience evaluating or deploying MES or electronic quality management (eQMS) platforms. * Background in rail, aerospace, automotive, or another environment where serialized traceability and configuration control are required. * Familiarity with SOLIDWORKS Manage, or with migration from PDM to a broader PLM platform. * Broader IT infrastructure experience, including identity and SSO, Windows Server, virtualization, backup strategy, and software license management. * Startup or small-team experience, with the ability to build process and documentation from nothing. ## Description * Own administration of the SOLIDWORKS PDM Professional environment, including archive and database servers, vault configuration, replication, backup and restore testing, upgrades, and license administration. * Design and maintain data cards, workflows, revision schemes, and state-driven permissions that reflect how engineering and production actually work. * Work with engineering to define and implement engineering release and change control, including ECR/ECO workflow, released-state protection, effectivity, and revision control that holds up against a production BOM. * Govern CAD and product data standards - part numbering, file naming, templates, Toolbox management, and the custom properties that drive downstream systems. * Maintain the integration between PDM and Odoo so that item masters, engineering BOMs, revisions, and released drawings reach manufacturing without manual re-entry. * Automate routine administration and data movement using Dispatch, scripting, and the PDM and Odoo APIs. * Support engineers and production staff directly - triage issues, onboard and train new users, and document the processes the systems enforce. * Partner with Manufacturing Engineering, Quality, and Supply Chain to evaluate, select, and deploy additional production systems as the organization scales, including MES, quality management, and serialized traceability. * Act as the technical authority on product data management and configuration control, influencing how Parallel Systems maintains as-designed, as-planned, and as-built configuration across a growing fleet. What Success Looks Like: * 30 days: You've mapped the current PDM and ERP environments. You will have started to map out a desired workflow for engineering data through conversations with engineering and procurement teams. You will have a burn down list of issues to fix and features to add. * 60 days: You've made meaningful progress burning down the issues on that list. PDM data cards and simple release workflows will be working as desired. Dispatch scripts will be cleaned up. * 90 days: You've implemented production release and ECR workflows that are tested and function as intended. You will begin to work with the manufacturing team to scope out their MES and other infrastructure, at least as it relates to engineering data from PDM. ## Related Videos - [Recruitment Reinvented: Bold strategies and the $10K signing incentive](https://www.wearedevelopers.com/videos/1068-recruitment-reinvented-bold-strategies-and-the-10k-signing-incentive) - [GraphQL: Does it replace SQL, REST or Something Else?](https://www.wearedevelopers.com/videos/1054-graphql-does-it-replace-sql-rest-or-something-else) - [JavaScript? No. Java Scripts! - Scripting with Java](https://www.wearedevelopers.com/videos/2094-javascript-no-java-scripts-scripting-with-java) - [Remote Driving on Plant Grounds with State-of-the-Art Cloud Technologies](https://www.wearedevelopers.com/videos/251-remote-driving-on-plant-grounds-with-state-of-the-art-cloud-technologies) - [Plan CI/CD on the Enterprise level!](https://www.wearedevelopers.com/videos/544-plan-ci-cd-on-the-enterprise-level) - [Intermediate Bitcoin Script](https://www.wearedevelopers.com/videos/25-intermediate-bitcoin-script) ## Related Articles - [Now is the time for industrialized software development](https://www.wearedevelopers.com/magazine/601-now-is-the-time-for-industrialized-software-development) - [How We Built a Worry-Free System That Runs for 10+ Years – And What We’d Do Again](https://www.wearedevelopers.com/magazine/751-how-we-built-a-worry-free-system-that-runs-for-10-years-and-what-we-d-do-again) - [MLops – Deploying, Maintaining And Evolving Machine Learning Models in Production](https://www.wearedevelopers.com/magazine/115-mlops-deploying-maintaining-and-evolving-machine-learning-models-in-production) - [Why Upskilling And Reskilling is Important For Developers](https://www.wearedevelopers.com/magazine/428-why-upskilling-and-reskilling-is-important-for-developers) - [How software is steering vehicle technology](https://www.wearedevelopers.com/magazine/515-how-software-is-steering-vehicle-technology) - [Everything a Developer Needs to Know About MCP with Neo4j](https://www.wearedevelopers.com/magazine/604-everything-a-developer-needs-to-know-about-mcp-with-neo4j)