> Markdown version of [/jobs/ext/3010507-energy-marshall-data-center-construction](https://www.wearedevelopers.com/jobs/ext/3010507-energy-marshall-data-center-construction). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Energy Marshall - Data Center Construction - **Company:** Insight Global - **Location:** Boydton, VA, United States - **Experience:** Expert - **Salary:** $83,200.0 - $166,400.0 - **Contract:** Permanent contract - **Skills:** Computer Engineering, Data Centers - **Published:** September 20, 2026 - **Apply:** https://www.techcareers.com/job.asp?id=3397710596&tx=VT6863TTI&pt=1&aff=0B19D771-A501-4A5E-8338-2A822B784D54&utm_source=Job%20Feed&utm_medium=textkernel&utm_campaign=DE&utm_term=0B19D771-A501-4A5E-8338-2A822B784D54 ## About the Role Bachelor's degree in Electrical Engineering, Computer Engineering, or related field 10+ years of experience within Commerical Construction Previous Data Center/Hyperscaler Experience 5+ years of technical engineering experience Experience in critical environment and industry standards and practices Ability to interpret line drawings and system redundancies to ensure design of LOTO systems is 100% effective and in compliance Experience in the Control of Hazardous Energy in complex mission critical infrastructure Experience with the operation and maintenance of building MEP systems. (Power distribution, lighting, grounding, fire alarm, security, life safety, controls systems and sprinkler systems) Understanding of electrical theory and practical application via your maintenance & operation of critical electrical equipment. (Paralleling switchgear, redundant UPS systems, DC battery strings, multi-source electrical utility switchgear, standby diesel generators, etc.) Knowledge of construction techniques, terminology, and documentation (blueprints, electrical one-lines, construction drawings etc.) Practical experience with building management systems and automation, controls & frameworks. ## Description Insight Global is seeking a Data Center Energy Marshall to work for one of our largest technology clients in the Charlotte, NC area. This person will be working in an assurance role that helps ensure the vendors and contractors energy isolation project meets the company's policy requirements for the data center construction and commissioning efforts. This person will be in a critical role implementing learnings, providing consistency, and driving rigor into the energy isolation program. The Energy Marshal is a representative who oversees and assures the Authorizing Energy Marshal (GC) and supplemental vendor support comply with the overall Energy Isolation Program Management on a datacenter construction campus. In addition to responsibilities outlined under Energy Marshall, this candidate will also lead as Owner's Mechanical, Electrical and Plumbing Construction Manager, including managing MEP Commissioning Issues. Utilize SPS-101 Energy Isolation SPS and SPS-101 Energy Isolation Guidebook as the baseline and foundation of the Energy Isolation Program that is implemented throughout the campus and project. Oversees and assures the overall compliance of the Energy Isolation Program and establish acceptance criteria for authorizing campus Energy Isolation Plan. Utilise local code and standards as the foundation for the Energy Isolation program that is implemented throughout the campus. Establish with the Engineering team a centralized Lockout Tag Out (LOTO) procedure with all campus entities and determine if a group or individual LOTO procedure will be required. Commencement of energy isolation activities with updates on a continuous basis. Act in coordination with the Engineering team as a subject matter expert in all energy isolation incident investigations in area of responsibility Participate in high-risk activity (HRA) planning meetings associated with energy isolation. Ensures high-risk SOWs, SOPs and MOPs are reviewed, and all sources of energy are identified ## Related Videos - [Swapping a Data Warehouse at Runtime: Zero-Downtime Migration Without Changing a Single Client](https://www.wearedevelopers.com/videos/100311-swapping-a-data-warehouse-at-runtime-zero-downtime-migration-without-changing-a-single-client) - [The Sustainability Race: AI's Promises, Pitfalls and Potential](https://www.wearedevelopers.com/videos/100155-the-sustainability-race-ai-s-promises-pitfalls-and-potential) - [What makes Cybersecurity different for critical infrastructure?](https://www.wearedevelopers.com/videos/571-what-makes-cybersecurity-different-for-critical-infrastructure) - [Agentic AI: building autonomous systems for developers](https://www.wearedevelopers.com/videos/100034-agentic-ai-building-autonomous-systems-for-developers) - [Building the Nervous System of AI - Michael Kagan (NVIDIA)](https://www.wearedevelopers.com/videos/2133-building-the-nervous-system-of-ai-michael-kagan-nvidia) - [Empowering and Motivating Developers in a Purpose-Driven Team of the Future](https://www.wearedevelopers.com/videos/1177-empowering-and-motivating-developers-in-a-purpose-driven-team-of-the-future) ## Related Articles - [How We Built a Worry-Free System That Runs for 10+ Years – And What We’d Do Again](https://www.wearedevelopers.com/magazine/751-how-we-built-a-worry-free-system-that-runs-for-10-years-and-what-we-d-do-again) - [A Guide to Green Tech and Green IT Careers](https://www.wearedevelopers.com/magazine/374-a-guide-to-green-tech-and-green-it-careers) - [How Engineering Hubs Build Visibility at Developer Conferences like WeAreDevelopers World Congress](https://www.wearedevelopers.com/magazine/720-how-engineering-hubs-build-visibility-at-developer-conferences-like-wearedevelopers-world-congress) - [From developer to manager – what does it take to become an engineering manager?](https://www.wearedevelopers.com/magazine/42-from-developer-to-manager-what-does-it-take-to-become-an-engineering-manager) - [What Makes WeAreDevelopers World Congress Different From Every Other Tech Event?](https://www.wearedevelopers.com/magazine/701-what-makes-wearedevelopers-world-congress-different-from-every-other-tech-event) - [Is Software Engineering Over-Saturated?](https://www.wearedevelopers.com/magazine/418-is-software-engineering-over-saturated)