> Markdown version of [/jobs/ext/3048805-connectivity-engineer-data-center-construction-oh](https://www.wearedevelopers.com/jobs/ext/3048805-connectivity-engineer-data-center-construction-oh). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Connectivity Engineer - Data Center Construction - OH - **Company:** TEKSYSTEMS INC. - **Location:** New Albany, OH, United States - **Experience:** Experienced - **Salary:** $124,800.0 - $166,400.0 - **Contract:** Temporary contract - **Skills:** Data Centers, Issue Tracking Systems - **Published:** September 24, 2026 - **Apply:** https://dejobs.org/x/x/7AD1E201BF7543B781157AC9CF05C61A/job/ ## About the Role 1) 5+ years of field auditing, validation, and quality/Cx experience 2) QC of telecom, ISP, cabling, and fiber network inside of data center environments 3) Quality process as part of a large-scale construction project, * Bachelor's degree in Engineering, Telecommunications, or equivalent practical experience * 3+ years of experience supporting data center connectivity during commissioning, QA/QC, or turnover phases * Strong hands-on experience with fiber optic infrastructure, structured cabling, and low-voltage systems * Proven ability to review and interpret test results, as-builts, and commissioning documentation * Experience performing field audits, inspections, or technical acceptance reviews * Comfortable working on-site in active construction environments and traveling between projects, * Experience commissioning hyperscale or mission-critical data centers * Strong familiarity with OTDR, power meter testing, and fiber acceptance criteria * Background in QA/QC, commissioning, or operational readiness programs * Experience working directly with commissioning agents, GCs, and low-voltage contractors * Knowledge of Meta-scale or similar enterprise cabling and connectivity standards * Strong documentation, issue tracking, and stakeholder communication skills ## Description Meta is seeking a Connectivity Engineer focused on Data Center Commissioning and Auditing to ensure network and connectivity infrastructure is installed, tested, validated, and production-ready prior to handoff to operations. This role is embedded in the late construction and commissioning phase, serving as a technical authority for connectivity quality, compliance, and readiness. Connectivity Engineers in this role work on-site alongside construction, commissioning, and operations readiness teams to verify that fiber, structured cabling, and connectivity systems meet Meta standards, specifications, and performance expectations before go-live. Responsibilities * Lead connectivity commissioning activities for new data centers and major expansions * Validate completion and readiness of fiber and structured cabling installations prior to turnover * Perform technical audits and field inspections to ensure contractor work complies with Meta standards, scope, and documentation * Review and approve fiber test results (OTDR, ILM, power testing) and commissioning reports * Identify installation defects, quality issues, or readiness gaps and drive corrective actions to closure * Partner with construction managers, commissioning agents, and vendors to resolve punch-list items related to connectivity * Verify labeling, pathways, grounding, room readiness (MMRs, MDFs, IDFs), and cable management * Participate in network readiness reviews and go-live signoffs * Ensure all connectivity assets are fully documented, tested, and accepted prior to handoff to operations * Capture lessons learned and contribute to continuous improvement of commissioning and audit standards ## Related Videos - [What makes Cybersecurity different for critical infrastructure?](https://www.wearedevelopers.com/videos/571-what-makes-cybersecurity-different-for-critical-infrastructure) - [Recruiting in 2025: Will AI Help or Take Over?](https://www.wearedevelopers.com/videos/1301-recruiting-in-2025-will-ai-help-or-take-over) - [The Sustainability Race: AI's Promises, Pitfalls and Potential](https://www.wearedevelopers.com/videos/100155-the-sustainability-race-ai-s-promises-pitfalls-and-potential) - [Remote Driving on Plant Grounds with State-of-the-Art Cloud Technologies](https://www.wearedevelopers.com/videos/251-remote-driving-on-plant-grounds-with-state-of-the-art-cloud-technologies) - [7 tips for releasing on a Friday afternoon: YouTrack to the rescue](https://www.wearedevelopers.com/videos/204-7-tips-for-releasing-on-a-friday-afternoon-youtrack-to-the-rescue) - [Building the Nervous System of AI - Michael Kagan (NVIDIA)](https://www.wearedevelopers.com/videos/2133-building-the-nervous-system-of-ai-michael-kagan-nvidia) ## Related Articles - [How We Built a Worry-Free System That Runs for 10+ Years – And What We’d Do Again](https://www.wearedevelopers.com/magazine/751-how-we-built-a-worry-free-system-that-runs-for-10-years-and-what-we-d-do-again) - [Best US AI Conferences for CTOs in 2026: Build vs. Buy, Vendor Evaluation, and Peer Intelligence](https://www.wearedevelopers.com/magazine/736-best-us-ai-conferences-for-ctos-in-2026-build-vs-buy-vendor-evaluation-and-peer-intelligence) - [The Best Job Search Websites of 2025](https://www.wearedevelopers.com/magazine/368-the-best-job-search-websites-of-2025) - [Why Attend a Developer Event in 2026?](https://www.wearedevelopers.com/magazine/688-why-attend-a-developer-event-in-2026) - [Fully Remote Software Engineer Jobs](https://www.wearedevelopers.com/magazine/447-fully-remote-software-engineer-jobs) - [Best Companies to work for in London: Top 25 Companies in 2023](https://www.wearedevelopers.com/magazine/187-best-companies-to-work-for-in-london-top-25-companies-in-2023)