> Markdown version of [/jobs/ext/3095385-technical-program-manager-broadband-deployme](https://www.wearedevelopers.com/jobs/ext/3095385-technical-program-manager-broadband-deployme). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Technical Program Manager, Broadband Deployme - **Company:** CONNECTALL, LLC - **Location:** New York, NY, United States - **Experience:** Expert - **Contract:** Permanent contract - **Skills:** ArcGIS (Software), Network Topologies, Project Management Software, Microsoft Office - **Published:** September 26, 2026 - **Apply:** https://www.juju.com/job/16_66b0a9432 ## About the Role Education Level Required: Bachelor's degree. Relevant experience required: * Minimum of 8-10 years of professional experience, with a minimum of 5 years focused on outside plant telecommunications construction, installation, or inspection, broadband/telecommunications program management, or infrastructure project delivery. * Experience with utility pole licensing and permitting processes across New York State, especially Upstate New York * Strong knowledge of broadband delivery technologies (aerial/underground fiber and fixed wireless) and network topologies. * Ability to translate field experience into formal systems for evaluating and reporting on infrastructure projects. * Experience generating or reviewing as-built documents, bills of materials, and other documentation of broadband projects. * Strong project management, time management, organizational, document coordination, and communication skills. * Proficiency in Microsoft Office, ArcGIS, and project management platforms. * Ability to travel for field verification activities Relevant experience preferred: * Certified Fiber Optic Technician (CFOT) or similar. * Experience managing the implementation of grant-funded infrastructure projects. * Experience with State and local permitting agencies and processes such as DOT, local municipalities, and private ROW owners. * Experience with inside plant construction, in building wiring and roof rights and regulations associated with the deployment of broadband infrastructure within buildings. ## Description Reporting to the Director, Fiber Deployment, the Technical Program Manager (PM) is responsible for ensuring the successful implementation of New York State's digital infrastructure initiatives. The Technical PM streamlines processes related to permitting and pole attachments and ensures the technical completion and readiness of ConnectALL funded broadband infrastructure projects. The Technical PM proactively identifies opportunities and implements solutions to accelerate broadband delivery by removing barriers related to permitting, pole attachments, and field coordination. WORK PERFORMED: * Lead the escalation and resolution of stalled applications to reduce average pole attachment durations and permit approval times for grant-funded projects. * Collaborate with internal and external stakeholders and regulatory agencies to facilitate improvements to the pole make-ready and permitting procedures. * Establish and maintain strategic relationships with pole and joint pole owners across all carriers to ensure regulatory compliance and process efficiency. * Coordinate resources to conduct physical audits of projects at varying stages to verify construction progress and confirm compliance with approved proposals and safety regulations. * Implement and enhance quality assurance plans, inspection procedures, and acceptance criteria for the testing and approval of wireline and wireless installations. * Forecast, schedule, and assign resource requirements for the timely completion of field audits; advance audits of project areas as the completion of construction becomes available. * Notify grantees and ensure the timely remediation of construction related deficiencies. * Monitor key program indicators, including on-time fiber delivery and deficiency remediation progress. * Identify project risks, deployment concerns, and progress updates to ConnectALL leadership as needed. * Identify and incorporate relevant data attributes into tracking systems to maintain organized records of inspection results and program milestones. ## Related Videos - [What makes Cybersecurity different for critical infrastructure?](https://www.wearedevelopers.com/videos/571-what-makes-cybersecurity-different-for-critical-infrastructure) - [Coffee with Developers - Scott Chacon on growing GitButler and the future of version control](https://www.wearedevelopers.com/videos/914-coffee-with-developers-scott-chacon-on-growing-gitbutler-and-the-future-of-version-control) - [Times of (climate) crisis - How and why sustainable software is a must!](https://www.wearedevelopers.com/videos/988-times-of-climate-crisis-how-and-why-sustainable-software-is-a-must) - [P2P networks in Blockchain](https://www.wearedevelopers.com/videos/209-p2p-networks-in-blockchain) - [Collaboration Quantified: Lessons from Open Source Developer Networks](https://www.wearedevelopers.com/videos/1422-collaboration-quantified-lessons-from-open-source-developer-networks) - [Location Verification without GPS?](https://www.wearedevelopers.com/videos/1184-location-verification-without-gps) ## Related Articles - [From developer to manager – what does it take to become an engineering manager?](https://www.wearedevelopers.com/magazine/42-from-developer-to-manager-what-does-it-take-to-become-an-engineering-manager) - [The CAMARA Project: How Telcos Collaborating Improves Developer Experience](https://www.wearedevelopers.com/magazine/671-the-camara-project-how-telcos-collaborating-improves-developer-experience) - [How We Built a Worry-Free System That Runs for 10+ Years – And What We’d Do Again](https://www.wearedevelopers.com/magazine/751-how-we-built-a-worry-free-system-that-runs-for-10-years-and-what-we-d-do-again) - [How to land a developer job in Amsterdam](https://www.wearedevelopers.com/magazine/36-how-to-land-a-developer-job-in-amsterdam) - [The Geometry of Incidents: Connecting User Impact to Architecture](https://www.wearedevelopers.com/magazine/764-the-geometry-of-incidents-connecting-user-impact-to-architecture) - [Developers are Building the Cities of the Future](https://www.wearedevelopers.com/magazine/536-developers-are-building-the-cities-of-the-future)