> Markdown version of [/jobs/ext/3419009-field-construction-manager-owner-s-representative-data-center-construction-hybrid](https://www.wearedevelopers.com/jobs/ext/3419009-field-construction-manager-owner-s-representative-data-center-construction-hybrid). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Field Construction Manager (Owner's Representative) - Data Center Construction (Hybrid) - **Company:** KALCON LLC - **Location:** Tulsa, OK, United States - **Experience:** Expert - **Salary:** $140,000.0 - $200,000.0 - **Contract:** Permanent contract - **Skills:** Microsoft Word, Microsoft Excel, Microsoft PowerPoint - **Published:** September 3, 2026 - **Apply:** https://www.indeed.com/viewjob?jk=d5130bc927c35e89 ## About the Role * Bachelor's degree in Construction Management, Engineering, Architecture, or related field preferred * 5-7 years of commercial, industrial, mission-critical, semiconductor, life sciences, or data center construction experience * Extensive field experience managing large-scale construction projects through all phases of delivery * Strong understanding of civil, structural, architectural, mechanical, electrical, plumbing, and low-voltage systems * Experience working directly with General Contractors and trade partners in active construction environments * Ability to read and interpret construction drawings, specifications, shop drawings, schedules, and contract documents * Strong knowledge of construction sequencing, means and methods, and field logistics * Proficiency with Microsoft Word, Excel, PowerPoint, and Project * OSHA 30 certification preferred * PMP, CCM, PE, or similar certifications are a plus * Strong analytical, communication, leadership, and conflict-resolution skills * Ability to proactively identify issues and drive solutions across multiple stakeholders and teams ## Description * Serve as the Owner's primary on-site representative throughout all phases of construction. * Maintain a consistent field presence and conduct daily site walks across all active construction areas. * Monitor civil, structural, architectural, mechanical, electrical, plumbing, and low-voltage construction activities to ensure compliance with project requirements. * Partner directly with the General Contractor to develop, review, validate, and reconcile construction schedules. * Independently verify field progress against contractor-reported schedule updates and milestone completion. * Evaluate planned versus actual construction progress and provide accurate reporting on project status, risks, and schedule performance. * Review and validate monthly schedule updates, CPM schedules, recovery plans, and detailed look-ahead schedules. * Identify schedule risks, delays, and execution challenges and recommend mitigation or recovery strategies. * Conduct field-based assessments to verify completion percentages, manpower loading, work sequencing, and critical path activities. * Serve as the Owner's advocate in interactions with General Contractors, subcontractors, vendors, consultants, and commissioning teams. * Lead and participate in daily coordination meetings, Owner-Architect-Contractor (OAC) meetings, and project planning sessions. * Track action items, commitments, and open issues through resolution. * Monitor contractor performance and promote accountability for safety, quality, schedule, and overall project execution. * Review construction activities for compliance with contract documents, approved submittals, project specifications, and industry standards. * Perform field inspections and document observations, deficiencies, corrective actions, and quality concerns. * Verify workmanship, installation accuracy, and construction quality throughout the project lifecycle. * Support commissioning readiness reviews and ensure systems are prepared for startup and testing activities. * Coordinate commissioning schedules and activities to align with construction progress and equipment readiness. * Manage Owner-Furnished Contractor-Installed (OFCI) equipment logistics, delivery tracking, receiving, storage, and installation readiness. * Coordinate equipment deliveries, rigging activities, crane operations, and installation sequencing. * Monitor procurement and delivery status of long-lead equipment and identify potential impacts to project milestones. * Coordinate owner-directed vendors including commissioning agents, IT contractors, testing agencies, consultants, and specialty vendors. * Support customer fit-out activities and ensure alignment with base-building construction schedules. * Coordinate facility operations activities including MOPs, shutdowns, utility tie-ins, notifications, and operational impacts. * Support planning and execution of critical utility outages and operationally sensitive construction activities. * Review and provide field input on GMP buyouts, constructability reviews, and value-engineering proposals. * Review change orders and evaluate potential impacts to schedule, constructability, quality, and project execution. * Validate monthly pay applications against observed construction progress and work-in-place. * Provide recommendations regarding cost avoidance opportunities, risk mitigation strategies, and construction efficiencies. * Maintain accurate daily and weekly field reports documenting manpower, installed progress, key activities, project risks, and major accomplishments. * Track and manage project documentation including RFIs, submittals, change orders, permits, and project logs. * Provide routine construction progress updates and executive-level reporting to Owner leadership. * Support permitting efforts, AHJ coordination, inspections, and Certificate of Occupancy requirements. * Monitor project compliance with applicable codes, regulations, and permitting requirements. * Lead punch list development, completion tracking, and closeout activities. * Coordinate final inspections, turnover readiness reviews, and owner acceptance activities. * Verify completion of as-built documentation, O&M manuals, training requirements, and turnover deliverables. * Support project financial reconciliation and contract closeout processes. * Facilitate successful transition of completed systems and facilities to operations teams. * Utilize modern construction management tools and technology to support field coordination, documentation, reporting, and project execution. * Maintain consistent communication with owner leadership, contractor management, vendors, commissioning teams, and operations personnel to ensure transparency and timely issue resolution. ## Related Videos - [Panel: New Work](https://www.wearedevelopers.com/videos/816-panel-new-work) - [In-depth .NET Azure Functions: Isolated mode, performance and durable AI agents](https://www.wearedevelopers.com/videos/100207-in-depth-net-azure-functions-isolated-mode-performance-and-durable-ai-agents) - [Developing the Rich Text Editor for DeepL.com](https://www.wearedevelopers.com/videos/1172-developing-the-rich-text-editor-for-deepl-com) - [From Cloud Racks to Control Cabinets: Operating Kubernetes on Edge Devices](https://www.wearedevelopers.com/videos/100160-from-cloud-racks-to-control-cabinets-operating-kubernetes-on-edge-devices) - [From Syntax to Singularity: AI’s Impact on Developer Roles](https://www.wearedevelopers.com/videos/900-from-syntax-to-singularity-ai-s-impact-on-developer-roles) - [Empowering and Motivating Developers in a Purpose-Driven Team of the Future](https://www.wearedevelopers.com/videos/1177-empowering-and-motivating-developers-in-a-purpose-driven-team-of-the-future) ## Related Articles - [What Makes WeAreDevelopers World Congress Different From Every Other Tech Event?](https://www.wearedevelopers.com/magazine/701-what-makes-wearedevelopers-world-congress-different-from-every-other-tech-event) - [Best US AI Conferences for CTOs in 2026: Build vs. Buy, Vendor Evaluation, and Peer Intelligence](https://www.wearedevelopers.com/magazine/736-best-us-ai-conferences-for-ctos-in-2026-build-vs-buy-vendor-evaluation-and-peer-intelligence) - [Why Attend a Developer Event in 2026?](https://www.wearedevelopers.com/magazine/688-why-attend-a-developer-event-in-2026) - [How We Built a Worry-Free System That Runs for 10+ Years – And What We’d Do Again](https://www.wearedevelopers.com/magazine/751-how-we-built-a-worry-free-system-that-runs-for-10-years-and-what-we-d-do-again) - [Top Must-Visit Developer Conferences in the US in 2026](https://www.wearedevelopers.com/magazine/679-top-must-visit-developer-conferences-in-the-us-in-2026) - [Why and How to Sponsor Developer Events](https://www.wearedevelopers.com/magazine/686-why-and-how-to-sponsor-developer-events)