> Markdown version of [/jobs/ext/3548467-document-controller-data-center-construction](https://www.wearedevelopers.com/jobs/ext/3548467-document-controller-data-center-construction). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Document Controller - Data Center Construction - **Company:** Manpower - **Location:** Phoenix, AZ, United States - **Experience:** Experienced - **Salary:** $134,597.0 - $144,997.0 - **Contract:** Permanent contract - **Skills:** Microsoft Word, Microsoft Excel, Microsoft Outlook, Data Centers, Data Infrastructure, Document Management Systems, Project Management Software, Microsoft PowerPoint, Microsoft SharePoint, Software Version Control - **Published:** October 1, 2026 - **Apply:** https://www.phoenixjobs.com/job.asp?id=3413479717&tx=KR8181FFQ&pt=1&aff=0B19D771-A501-4A5E-8338-2A822B784D54&utm_source=Job%20Feed&utm_medium=textkernel&utm_campaign=DE&utm_term=0B19D771-A501-4A5E-8338-2A822B784D54 ## About the Role * 5+ years of experience in Construction Document Control and Electronic Document Management Systems such as Procore, ProjectSight, SharePoint, or Common Data Environments (CDEs). * 3+ years of experience managing turnover packages, O&M manuals, as-built drawings, commissioning records, warranties, training documentation, and closeout deliverables. * 3+ years of experience working with construction drawings, specifications, RFIs, submittals, change orders, document registers, and project trackers. * Strong Excel and document tracking capabilities with experience using Microsoft Excel, Word, Outlook, Teams, and PowerPoint. * Ability to interpret construction specifications, coordinate across multiple stakeholders, identify documentation gaps, and maintain revision/version control. ## Description * Maintain organized and traceable project records, including drawings, submittals, RFIs, reports, permits, closeout records, and turnover documentation throughout the construction lifecycle. * Administer and track technical submittals, shop drawings, product data, samples, RFIs, revisions, approvals, and outstanding actions. * Develop and maintain turnover and closeout documentation trackers while identifying documentation gaps and turnover risks. * Review, validate, and manage O&M manuals, as-built drawings, commissioning records, warranties, training records, and other turnover-critical documentation. * Perform quality-control reviews to ensure documentation is complete, accurate, properly classified, audit-ready, and compliant with project requirements., * Support the delivery of large-scale, mission-critical data center projects for a leading global technology client. * Gain exposure to the full project lifecycle, including design, construction, commissioning, closeout, and operations transition. * Work closely with Construction Managers, Project Engineers, Commissioning Teams, Contractors, Designers, Vendors, and Operations. * Develop expertise in industry-leading document management systems, Common Data Environments (CDEs), and turnover processes. * Contribute directly to project success by improving turnover readiness and supporting successful operational handover.