> Markdown version of [/jobs/ext/3960273-project-scheduler-infrastructure-solutions](https://www.wearedevelopers.com/jobs/ext/3960273-project-scheduler-infrastructure-solutions). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Project Scheduler, Infrastructure Solutions - **Company:** Spectraforce - **Location:** Pelzer, SC, United States - **Experience:** Expert - **Salary:** $100,630.0 - **Contract:** Temporary contract - **Skills:** Project Management Software, Microsoft Project, Oracle (Applications), Primavera, Software Version Control - **Published:** October 27, 2026 - **Apply:** http://leoforce.us/Careers/Spectraforce/JobDetails.html?jobid=dadb755b-1c61-4e54-a547-494707be4c54&OrgId=1&UserId=1268 ## About the Role * Minimum of 5 years of experience in manufacturing, data center construction, or EPC. * Advanced use of MS Project, Primavera P6, or other scheduling tools. * Intermediate proficiency in EcoSys, Oracle or other ERP systems. * Proficiency with construction tools such as Procore. * A plus if you have a deep understanding of modular and prefabricated construction methods, industrial scale piping and power systems, and complex manufacturing workflows. Education: * Bachelor's degree in business, Financial or Project Management. ## Description * Create, monitor, and analyze project schedules in accordance with standard of best project practice. * Track, analyze, and report information appropriately to allow the project teams to manage their projects and evaluate weekly reports. * Ensure accuracy of project schedules, performed version control, identify potential project schedule delays and facilitating intervention in a timely manner. * Prepare, implement, and monitor scopes of work using Work Breakdown Structure (WBS) for control and integrity. * Monitor projects' progress, including identifying critical activities and reviewing forecasts and progress achieved to date.? Recommend actions to keep project on track and within budget. * Maintain project risk register to ensure that risks are effectively managed to minimize their impact on schedule, scope, and budget of projects. * Track baselines, perform what-if analysis, and develop contingency plans. * Perform coordination of cross-functional departments to identify project issues, monitor action items, and work with the project manager to ensure resolution.