> Markdown version of [/jobs/ext/3997217-scheduling-manager-owner-s-representative-data-center-construction-remote](https://www.wearedevelopers.com/jobs/ext/3997217-scheduling-manager-owner-s-representative-data-center-construction-remote). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Scheduling Manager (Owner's Representative) - Data Center Construction - Remote - **Company:** KALCON LLC - **Location:** Dallas, TX, United States - **Experience:** Expert - **Salary:** $150,000.0 - $200,000.0 - **Contract:** Permanent contract - **Skills:** Microsoft Word, Microsoft Excel, Analysis of Variance (ANOVA), Microsoft Outlook, Data Centers, Monte Carlo Methods, Microsoft PowerPoint, Primavera, Resource Loading, Tools for Reporting - **Published:** October 28, 2026 - **Apply:** https://www.indeed.com/viewjob?jk=42dee41fd5c3fb00 ## About the Role * Bachelor's degree in Construction Management, Engineering, Project Management, Architecture, Business, or a related field preferred. * 7+ years of experience in construction scheduling, project controls, project management, or related project planning functions. * Experience supporting commercial, industrial, mission-critical, data center, healthcare, manufacturing, energy, or large-scale infrastructure construction projects. * Advanced proficiency in Primavera P6, including schedule development, maintenance, analysis, and schedule auditing. * Experience reviewing contractor schedules, CPM schedules, baseline schedules, recovery schedules, and schedule updates. * Strong understanding of Critical Path Method (CPM) scheduling principles, schedule logic development, resource loading, float analysis, constraints management, and schedule forecasting. * Experience performing schedule audits, schedule variance analysis, delay analysis, time impact analysis, and schedule recovery assessments. * Familiarity with DCMA Schedule Assessment metrics and schedule quality analysis methodologies. * Ability to review and analyze design, procurement, construction, commissioning, and turnover activities within integrated project schedules. * Experience supporting project controls processes, including schedule reporting, risk analysis, forecasting, and executive-level reporting. * Strong proficiency with Microsoft Excel, Word, PowerPoint, Outlook, Teams, and schedule reporting tools. * Ability to interpret construction drawings, specifications, contracts, procurement plans, and technical project documentation. * Excellent analytical, organizational, and problem-solving skills with strong attention to detail. * Strong written and verbal communication skills with the ability to present schedule data and recommendations to project teams, contractors, clients, and executive leadership. * Ability to manage multiple projects and priorities in a fast-paced environment. ## Description Schedule Development and Standards * Help establish and maintain repeatable scheduling frameworks, templates, coding structures, calendars, milestone standards, and reporting * Contribute to planning and sequencing activities from concept through design, procurement, construction, startup, commissioning, and * Define or review activities, scope, durations, logic, interfaces, calendars, constraints, and resource loading as * Standardize Level 1 and Level 2 milestones to support comparison across projects and validate that constraints are used only where * Develop policies, procedures, and user training for internal and external scheduling Independent Schedule Audit and Analysis * Independently audit general contractor Primavera P6 schedules and XER files for accuracy, completeness, logic, and conformance with contractual requirements and ǪII * Perform baseline and progress audits at least monthly and focused audits following contractor updates or at ǪII's * Run DCMA schedule-quality checks and compare current updates against the contractual baseline and prior reporting * Review critical and near-critical paths, parallel activities, multiple float paths, constraints, calendars, open ends, lags, out-of-sequence progress, and logic * Identify variance drivers, schedule risks, unrealistic assumptions, and opportunities for corrective or recovery * Perform time-impact analyses, delay and claims analyses, schedule variance analyses, and schedule-risk scenarios, including Monte Carlo analysis where Progress, Milestone and Risk Reporting * Track and report critical milestones, forecast dates, float erosion, slippage, recovery commitments, and schedule * Track OFCI manufacturing and delivery dates, vendor startups, commissioning activities, and owner-direct work and highlight problem * Validate schedule progress through coordination with field personnel, superintendents, contractors, vendors, and supporting * Develop clear schedule reports, narratives, variance explanations, and decision-ready recommendations for project and executive * Translate schedule sequences into PDF drawings or other visual workflows when useful for planning and