> Markdown version of [/jobs/ext/4406388-hvac-superintendent-onsite-pampa-texas-data-center-construction](https://www.wearedevelopers.com/jobs/ext/4406388-hvac-superintendent-onsite-pampa-texas-data-center-construction). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # HVAC Superintendent- (Onsite-Pampa Texas/Data Center Construction) - **Company:** Kelso Industries - **Location:** Pampa, TX, United States - **Experience:** Expert - **Contract:** Permanent contract - **Skills:** Construction Estimating Software, Data Centers, Network Troubleshooting, Project Management Software, Microsoft Office, Performance Testing, Bluebeam, Software Troubleshooting, Workday - **Published:** October 12, 2026 - **Apply:** https://www.indeed.com/viewjob?jk=0eab00be87e77af5 ## About the Role * High school diploma or GED required; technical degree, apprenticeship, or trade certification preferred. * Minimum of ten (10) years of experience in mechanical construction, HVAC, plumbing, process piping, controls, startup, or commissioning. * Minimum of five (5) years of supervisory experience leading field operations on large-scale construction projects. * Extensive experience with equipment startup, testing, balancing, controls integration, and system commissioning. * Thorough understanding of construction sequencing, field operations, startup procedures, and integrated building systems. * Ability to read and interpret construction drawings, specifications, P&IDs, equipment submittals, control diagrams, and sequences of operation. * Strong troubleshooting, leadership, organizational, and communication skills. * Experience coordinating subcontractors, equipment manufacturers, and specialty vendors during commissioning activities. * Proficiency with Microsoft Office Suite, Procore, Bluebeam, and construction management software. * OSHA 30 certification required or ability to obtain. * Commissioning certification (CxA, CCP, CBCP, QCxP, or equivalent) preferred. * Ability to travel extensively to assigned project sites. ## Description * Report directly to the Field Operations Director and provide regular updates regarding field commissioning progress, manpower, startup activities, project readiness, and field challenges. * Execute the commissioning plan developed by the Commissioning Project Manager. * Direct and supervise all daily field commissioning activities on assigned projects. * Lead commissioning technicians, startup personnel, subcontractors, manufacturers, and specialty vendors throughout commissioning activities. * Coordinate daily manpower, work assignments, and commissioning priorities. * Develop and maintain daily and weekly startup schedules that align with project milestones. * Coordinate equipment startup with manufacturers, controls contractors, TAB agencies, electrical contractors, and subcontractors. * Verify that systems are complete, operational, and ready for startup prior to commissioning activities. * Supervise startup and functional performance testing of HVAC, plumbing, process piping, mechanical equipment, controls, and integrated building systems. * Coordinate system flushing, pressure testing, balancing, controls integration, and equipment verification. * Identify commissioning deficiencies, troubleshoot system issues, coordinate corrective actions, and verify successful resolution. * Maintain field commissioning punch lists, deficiency logs, startup records, and testing documentation. * Coordinate commissioning activities with Project Superintendents, Project Managers, Project Engineers, Quality, Safety, and field operations personnel. * Ensure commissioning activities comply with contract requirements, project specifications, manufacturer recommendations, and company quality standards. * Conduct startup safety meetings and ensure compliance with Lockout/Tagout procedures and other commissioning safety requirements. * Support owner demonstrations, training sessions, and final system turnover. * Submit complete and accurate field commissioning documentation to the Commissioning Project Manager for project closeout. * Mentor field personnel on commissioning procedures, startup best practices, and safe execution of commissioning activities. * Additional responsibilities may be assigned as needed., Work at heights - including ladders, scaffolds, lifts, platforms, mezzanines, and elevated structures up to and exceeding 100 feet. * Work around moving equipment - such as forklifts, cranes, aerial lifts, skid steers, and other heavy machinery. * Standing and walking for extended periods * Perform physically demanding tasks - including lifting, carrying, pushing, pulling, bending, kneeling, crawling, climbing, and reaching. * Maintain situational awareness in dynamic, noisy, and high-hazard environments. * Use required PPE including hard hats, safety glasses, gloves, hearing protection, fall protection, and respiratory protection when applicable. * Work in confined or restricted spaces as required by project scope. * Operate or use hand and power tools safely and effectively. * Follow safety protocols, lockout/tagout procedures, and hazard-control measures. * Communicate effectively with team members, supervisors, and equipment operators using verbal instructions, radios, and hand signals. Physical Demands: Lifting and carrying materials and equipment up to 50 lbs frequently * Working on uneven terrain including dirt, gravel, mud, rebar mats, and unfinished surfaces. * Climbing ladders and stairs repeatedly throughout the workday. * Bending, stooping, kneeling, and crouching to perform installation, repair, or inspection tasks. * Repetitive motions including gripping, twisting, hammering, and tool operation. * Full use of hands, arms, legs, and balance to safely navigate job sites and perform tasks. * Visual and auditory acuity sufficient to identify hazards, read instructions, and communicate in high-noise environments. Environmental Conditions: * Year-round outdoor environments including extreme heat, cold, rain, snow, and wind. * Industrial indoor environments such as data centers, manufacturing floors, mechanical rooms, and utility spaces. * High-noise areas requiring hearing protection. * Dusty, dirty, or fume-producing environments depending on project scope. * Tight or congested workspaces with multiple trades working simultaneously. * Varying lighting conditions including low-light or task-light-only areas. Cognitive & Safety-Critical Requirements Maintain alertness and awareness for long periods. * Recognize and avoid hazards including fall hazards, electrical hazards, pinch points, and equipment movement. * Follow written and verbal instructions accurately. * Make quick, safe decisions in changing conditions. * Work independently or as part of a team depending on task needs.