> Markdown version of [/jobs/ext/4488585-safety-manager-data-center-construction](https://www.wearedevelopers.com/jobs/ext/4488585-safety-manager-data-center-construction). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Safety Manager - Data Center Construction - **Company:** KALCON LLC - **Location:** Abernathy, TX, United States - **Experience:** Expert - **Salary:** $150,000.0 - $200,000.0 - **Contract:** Permanent contract - **Skills:** Spreadsheets, Databases, Data Centers, Microsoft Office - **Published:** October 29, 2026 - **Apply:** https://www.indeed.com/viewjob?jk=49efbfcf677c82fb ## About the Role * Minimum 7 to 10 years construction/safety experience in critical facilities, mission critical, semiconductor, or similar scope projects primarily for vertical building construction. * Effective communication skills and ability to work with all levels of the project team. * Evidence of completing OSHA 30 Hour Construction Outreach Training within the last three years. In the alternative, evidence of completing the OSHA 500 or OSHA 502 Class may be provided. * Current First Aid and CPR training from a provider recognized by OSHA. * Minimum of holding a valid Certified Safety Professional (CSP) or Construction Health and Safety Technician (CHST) certificate issued by the BCSP Board of Certified Safety Professionals. * Flexibility in schedule and transportation to work at multiple sites based on assigned schedule and duties and perform time management as required to meet all the position requirements. * Proficiency with Microsoft office and related spreadsheet and database software. * Ability to provide management oversight on behalf of the Owner and effectively complete reporting on a daily basis as required by the program. ## Description * Look ahead on high-risk activities and assisting with risk analysis of upcoming work. * Produce daily observations and indicator/trend reports on Procure. * Monitor compliance with site safety programs and requirements, which defines safety requirements that contractors must comply with while working as an Owner's Representative on Data Center projects. * Perform Daily Safety reviews of work in progress in accordance with current Safety Regulations and Standard Operating Procedures (SOP). * Conducts construction site safety audits to identify improper procedures, checks equipment and facilities for hazardous conditions and recommends corrective actions. * Audit and review Methods of Procedures (MOPs) for safety compliance and to minimize site impacts. * Submit Daily, Weekly, and Monthly Safety reports required by the Program. * Monitor compliance to all current OSHA requirements that relate to the specific construction projects. * Report to the Director of Safety, including but not limited to, attending any required meetings or providing safety reports/analysis as requested. * Immediately notify the Director of Safety of any incident or recordable injury on projects. * Monitor Contractor compliance with COVID-19 regulations as defined by city, state, and OSHA guidelines. Confirm that Contractor Safety Plans are complete and updated to address COVID Safety Guidelines on each project site. * Confirm that Contractor is reporting all recordable injuries and near-miss incidents within the required timelines and by filing the proper forms. Review the report for accuracy before filing. * Review and provide comments to the Owner on the project-specific "Project Health, Safety & Environmental Plan" as prepared by the Owner or the Contractor. * Perform ongoing construction site safety inspections and generate safety report for all site visits. * Identify site safety hazards and provide immediate direction to contractor safety representative to eliminate or mitigate them. * Perform reviews and inspections of the jobsite to assure compliance with health and safety regulations and applicable codes. * Participate in site inspections and testing as necessary for required permits, including confined space, hot work, trenching, etc. * Confirm that the New Hire Safety Orientation on-line safety training are available onsite. * Confirm that contractors are performing tailgate safety meetings and training as required by their Contract and/or OSHA requirements. * Attend pre-construction meetings to present Owner's safety program and the role of the field safety representative. Provide comprehensive safety support and guidance for Project Team. * Monitor adherence to zero tolerance and corrective action policy for workers found not in compliance with the Program's safety policy. * Conduct project safety stand-downs with all crews to review the incident for injuries. Educate all site workers on how to prevent a repeat accident.