> Markdown version of [/jobs/ext/4756443-connectivity-data-center-construction](https://www.wearedevelopers.com/jobs/ext/4756443-connectivity-data-center-construction). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Connectivity - Data Center Construction - **Company:** Legacy - **Location:** Lebanon, IN, United States - **Experience:** Experienced - **Contract:** Permanent contract - **Skills:** Building Information Modeling, Cloud Computing, Software Documentation, Construction Estimating Software, Data Centers, Networking Hardware, Project Management Software, Microsoft Office, Microsoft Project, Network Diagrams, Primavera, System Testing, Bluebeam, Test Scripts, Bicsi, Information Technology, Autodesk Autocad - **Published:** November 17, 2026 - **Apply:** https://www.thejobnetwork.com/job/7c5e9485-72cc-4370-9585-c294a0dec875/connectivity-data-center-construction ## About the Role What We're Looking ForRequired Qualifications * Three or more years of experience in connectivity construction, low-voltage systems, structured cabling, telecommunications infrastructure, field engineering, or related construction supervision. * Experience working on hyperscale data center or mission-critical construction projects. * Strong working knowledge of structured cabling systems, fiber optic infrastructure, low-voltage installations, and associated pathways and equipment spaces. * Experience coordinating or supervising connectivity installations within active construction environments. * Ability to read and interpret connectivity drawings, MEP drawings, specifications, network diagrams, submittals, and technical documentation. * Understanding of telecommunications pathways, cable trays, fiber distribution, equipment rooms, racks, cabinets, and associated connectivity infrastructure. * Familiarity with structured cabling installation standards, including TIA/EIA requirements and BICSI best practices. * Experience supporting or coordinating connectivity testing, inspections, deficiency resolution, or system turnover. * Understanding of construction sequencing, trade coordination, field installation, testing, and commissioning processes. * Ability to coordinate effectively with specialty contractors, MEP trades, project leadership, and other construction disciplines. * Strong communication, organization, technical coordination, documentation, and problem-solving skills. * Proficiency with Microsoft Office and familiarity with construction management software. A bachelor's degree is not required. Candidates with equivalent experience gained through connectivity construction, telecommunications infrastructure, low-voltage installation, field supervision, or related skilled trades will be considered. Preferred Qualifications * Previous experience as a Connectivity Superintendent, Low Voltage Superintendent, Connectivity Field Engineer, Telecommunications Project Manager, Structured Cabling Supervisor, or similar construction professional. * Experience supporting large-scale hyperscale data center projects, including connectivity infrastructure within white space and associated telecommunications spaces. * Experience coordinating connectivity installations with mechanical, electrical, controls, fire/life safety, and other MEP systems. * Familiarity with electrical power requirements, grounding and bonding, and other systems that interface with connectivity infrastructure. * Experience coordinating fiber optic testing, copper certification, OTDR testing, and related system validation activities. * Experience with rack integration, white space infrastructure deployment, and data center commissioning processes. * Knowledge of hyperscale owner standards, phased turnover, commissioning, and Integrated Systems Testing requirements. * Experience working with large general contractors, specialty telecommunications contractors, EPC organizations, or mission-critical project teams. * Experience using Procore, Autodesk Construction Cloud (BIM 360), Bluebeam, Primavera P6, Microsoft Project, or similar project management platforms. * Bachelor's degree in Engineering, Construction Management, Telecommunications, Information Technology, or a related field. Preferred Certifications * BICSI Installer or Registered Communications Distribution Designer (RCDD) * Fiber Optic Association (FOA) certification * OSHA 10 or OSHA 30 * Manufacturer certifications such as Corning, CommScope, Panduit, or similar * Other relevant telecommunications, structured cabling, or low-voltage certifications ## Description Legacy Professional Services is seeking an experienced Connectivity Construction Professional to support the coordination, installation, integration, testing, and turnover of structured cabling, fiber optic, and low-voltage connectivity infrastructure on hyperscale data center construction projects. We're looking for someone with hands-on connectivity construction experience who understands structured cabling systems, fiber optic infrastructure, low-voltage installations, and the coordination required to deliver these systems within complex construction environments. The ideal candidate has worked on hyperscale data center or mission-critical construction projects and brings experience in connectivity field engineering, construction management, field supervision, or telecommunications infrastructure installation. Candidates with backgrounds as Connectivity Superintendents, Low Voltage Superintendents, Structured Cabling Supervisors, Fiber Optic Construction Managers, Telecommunications Project Managers, or Connectivity Field Engineers are encouraged to apply. Working alongside MEP leadership, Project Managers, Superintendents, QA/QC professionals, commissioning teams, design teams, and specialty contractors, you'll help ensure connectivity infrastructure is properly coordinated with mechanical, electrical, controls, and other critical building systems. This is a field-focused position supporting connectivity installation, contractor coordination, technical documentation, field issue resolution, testing, commissioning readiness, and project turnover. What You'll Do * Support the installation, integration, and deployment of structured cabling, fiber optic, and low-voltage connectivity systems on hyperscale data center construction projects. * Coordinate connectivity installation activities with mechanical, electrical, controls, fire/life safety, and other MEP systems to ensure proper interfaces and construction sequencing. * Review connectivity and MEP drawings, network diagrams, specifications, submittals, coordination drawings, and project documentation to identify installation requirements, conflicts, and dependencies. * Coordinate telecommunications pathways, cable trays, sleeves, penetrations, equipment spaces, grounding and bonding, power requirements, and other interfaces between connectivity and MEP systems. * Support the coordination of telecommunications rooms, network spaces, racks, cabinets, fiber infrastructure, and associated connectivity equipment. * Coordinate rack-and-stack activities and deployment of white space infrastructure as required by the project. * Monitor connectivity installations to support compliance with project specifications, manufacturer requirements, applicable TIA/EIA standards, BICSI best practices, and hyperscale owner requirements. * Work with connectivity contractors, MEP trades, design teams, and project leadership to identify and resolve field conflicts, installation deficiencies, and constructability issues. * Coordinate and document fiber optic testing, copper certification, OTDR testing, and other connectivity system validation activities. * Collaborate with QA/QC and commissioning teams to support inspections, testing, system readiness, Integrated Systems Testing, and client acceptance. * Track connectivity materials, equipment, network hardware deliveries, installation progress, testing documentation, deficiencies, and turnover requirements. * Support short-term planning and construction sequencing to align connectivity installation with MEP construction, equipment energization, commissioning, and phased turnover milestones. * Maintain as-built drawings, test reports, deficiency logs, turnover packages, and other project documentation using Procore, Autodesk Construction Cloud (BIM 360), Bluebeam, and related construction management platforms. * Support final inspections, punch-list completion, phased turnover activities, and owner handover.