> Markdown version of [/jobs/ext/4802759-data-center-technician](https://www.wearedevelopers.com/jobs/ext/4802759-data-center-technician). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Data Center Technician - **Company:** SRI Tech Solutions Inc. - **Location:** Social Circle, GA, United States - **Experience:** Experienced - **Contract:** Temporary contract - **Skills:** Microsoft Word, Microsoft Excel, Data Centers, Productivity Software - **Published:** November 20, 2026 - **Apply:** https://www.thejobnetwork.com/job/08c1f4da-9561-46de-a63f-a0c232978ca5/data-center-technician ## About the Role * 5+ years in structured cabling, fiber optic installation, or data center infrastructure deployment * 2+ years in a lead, foreman, or supervisory role directing crews of 3+ technicians * Demonstrated experience planning and executing Division 27 installation projects from design to completion * Experience reading and interpreting engineering drawings, cable schedules, rack diagrams, and port maps Technical Skills * Expert-level fiber optic termination, testing, and troubleshooting (single-mode and multi-mode) * Proficient with: VFL, OTDR, optical power meter, fiber scope, Cat6 tester, LC/MTP-12/MTP-24 connectors, IR card, OneClick and Cletop cleaners * Effective Layer 1 troubleshooting methodology - can isolate and resolve connectivity issues systematically * Knowledge of SLA structures and prioritization logic * Proficiency in productivity tools: Excel/Sheets, Word/Docs, project tracking software Leadership & Communication * Strong written and verbal communication - can produce professional progress reports, escalation summaries, and client-facing updates * Demonstrated ability to coach and develop junior team members (not just direct them) * Comfortable representing the team in meetings with client representatives * Professional demeanor: composed under pressure, solutions-oriented, accountable Other Requirements * Pass customer background verification (BGV) * Willing and able to travel domestically to other ENSD sites (up to 25% travel) * Meet physical requirements: regularly carry 20 lbs, lift 50 lbs, work from ladders, move frequently between work areas ## Description Planning & Execution (40%) * Plan project execution: cable runs, material pathways, labor allocation, sequencing * Develop and maintain project execution timelines aligned to SLA targets * Validate Engineering Deployment Plans (EDPs) and Bills of Material (BOMs) before work begins * Estimate labor hours for projects and limited assignments * Identify dependencies, blockers, and critical path items BEFORE they become problems * Make real-time execution decisions within project scope without waiting for OM approval * Coordinate with Meta DCPMs, network engineers, and cross-functional partners at site level Technical Leadership & Problem Solving (25%) * Serve as the primary technical escalation point for all L1 and L2 issues at your site * Troubleshoot complex Layer 1 fiber and copper issues that exceed L2 capability * Conduct root-cause analysis on failed audits, rework items, and installation defects * Validate cable paths, patch schedules, port maps, and rack diagrams for accuracy * Authorize material substitutions per approved equivalents * Resolve BOM discrepancies, EDP conflicts, and material shortages through field engineering judgment * Make technical go/no-go decisions for project phases (field installation, audit, QC) People Development & Site Leadership (20%) * Assign daily work to technicians based on skill level, project priority, and SLA position * Coach and mentor L1 and L2 technicians through on-the-job training and constructive feedback * Conduct informal skill assessments - identify who is ready to advance and who needs support * Enforce productivity, quality, and safety standards consistently * Hold team members accountable for workmanship, timeliness, and professional conduct * Build a team culture of ownership: we don't leave problems for the next person * Serve as technical buddy/mentor for new hires during their first 2 weeks on site Quality & Compliance (10%) * Conduct pre-QC inspections on ALL installations before customer audit - catch issues before they are found * Own Right First Time at your site: if QC finds defects, that is your accountability * Write and maintain Point-to-Point (PTP) documentation, ladder safety forms, and technical progress reports * Verify completed work against EDP specifications, cable schedules, and port maps * Ensure all work meets Meta Division 27 installation standards and dressing requirements Communication & Reporting (5%) * Report daily/weekly progress to Operations Manager: what is done, what is blocked, what is next * Escalate blockers proactively WITH recommendations (not just flags) * Participate in project kickoffs * Interface professionally with Meta site contacts (DCPMs, engineers, NOC technicians) * Represent client competence and professionalism in all customer-facing interactions * Provide timely, accurate progress updates suitable for executive-level consumption when required