> Markdown version of [/jobs/ext/4852264-software-project-manager](https://www.wearedevelopers.com/jobs/ext/4852264-software-project-manager). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Software Project Manager - **Company:** Actalent - **Location:** Bingen, WA, United States (Remote available) - **Experience:** Expert - **Salary:** $143,000 - $229,000 - **Contract:** Temporary contract - **Skills:** Asana, JIRA, Microsoft Azure, Information Systems, Microsoft Project, Project Management Information Systems, Scrum Methodology, Software Engineering, Software Project Management, Smartsheet, Gitlab, Information Technology, DO-178B, Software Coding - **Published:** November 24, 2026 - **Apply:** https://www.careercircle.com/jobs/all/all/usa/wa/bingen/07354875-c1db-4059-866b-8d06b26b6935 ## About the Role Bingen, WA, *Remote JIRA Asana Gitlab Planning Robotics Visionary Leadership Innovation Smartsheet Microsoft Azure Sprint Planning Computer Science Microsoft Project Project Management Information Systems Time Off Management Engineering Design Process Balancing (Ledger/Billing) Software Project Management DO-178B/C (Software Considerations in Airborne Systems and Equipment Certification), * Bachelor's in engineering, computer science, information systems or another technical field. * 5+ years running projects or programs, with a big share of that time on software development. * Hands-on use of a planning tool like Smartsheet, Microsoft Project or Asana, and you're happy to live in Smartsheet day to day. * Experience balancing people and priorities for a team juggling several projects at the same time. * You can talk through bugs, features and code dependencies with engineers, then turn that into plain status and risk updates for leadership. * A track record of renegotiating scope or dates with stakeholders when the team is out of capacity. ----- Preferred Skills * Earlier years spent writing code or doing other hands-on engineering before you moved into project management. * Daily use of GitLab for issues, milestones and boards, or a similar tool like Jira or Azure DevOps. * Software project work in defense, aerospace, robotics or other hardware-heavy fields, ideally under DO-178C or a similar safety-critical standard. * PMP, CSM, SAFe or a similar certification., Plan on being onsite about 80% of the time, with the rest remote. You'll travel about 5% of the time, sometimes overseas and sometimes with little notice. Expect daily computer work, regular walks out to the production floor, lifting as much as 30 lbs, and steel-toed shoes plus other safety gear on the shop floor. You must meet ITAR U.S. person requirements. A drug test and pre-employment screening are required. ## Description This is the project management seat for an aerospace software group that needs someone to bring order to a lot of moving work. You'll own the plans, the priorities and the status reporting for every software project the team carries, and you'll be the one who keeps engineers pointed at the work that matters most. Most of the team sits onsite with you and smaller software groups work from other countries, so you'll pass work across time zones most weeks. It's a ground floor spot on a new initiative inside a large company, which means you'll have room to decide how planning and tracking get done. The best fit is someone who wrote software before switching to project management, or a PM who has earned the trust of engineers by running software work right next to them., * Own the plan, the tracking and the delivery dates for every active software project. * Keep project plans current in Smartsheet so leadership can see scope, dates and status at a glance. * Follow engineering work in GitLab and roll the status up into Jira for company reporting. * Decide with engineering leads who works on what, so nobody gets pulled in five directions. * Run intake for new requests, settle what starts now and what waits, and explain the tradeoff to the people asking. * Spot risks, blockers and staffing conflicts while there's still time to fix them, and push owners to close them out. * Lead standups, sprint planning and retros that match how the team already works.