> Markdown version of [/jobs/ext/4861397-connectivity-engineer-deployment](https://www.wearedevelopers.com/jobs/ext/4861397-connectivity-engineer-deployment). Every page supports `.md` or `Accept: text/markdown`. Links point to the HTML versions so they work for humans too. Agent guide: [/agents.md](https://www.wearedevelopers.com/agents.md). --- # Connectivity Engineer, Deployment - **Company:** Fluidstack Ltd - **Location:** United States - **Contract:** Permanent contract - **Skills:** Artificial Intelligence, Live Virtual and Constructive, Graphics Processing Unit (GPU), Computer Network Operations, Test Scripts, Bicsi - **Published:** November 25, 2026 - **Apply:** https://www.careerbuilder.com/job-details/connectivity-engineer-deployment--9913a791-003f-4c28-b19e-1db0a48eb5c3 ## About the Role Artificial Intelligence (AI), Network Operations Center, GPU (Graphics Processing Unit), Budgeting, Onboarding, Quality Assurance, Quality Control, Safety Codes, Project/Program Coordination, Low Voltage (LV) ## Description * Compress the install. Land and certify hundreds of thousands of fiber terminations per building in weeks, across multiple concurrent gigawatt builds. * Make quality a gate, not a hope. At AI scale, one dirty connector is a flapping link is a stalled training run. Every link tested, every loss budget proven, before the first GPU powers on. * Scale an LVC workforce faster than the market produces it. Build the playbooks, QA gates, and field standards that take a contractor crew from onboarding to first-pass-yield quality in days, and hold them to a hyperscale bar at speed., * Own the full lifecycle of physical installation projects: coordinate LVC schedules, run QA/QC on contractor work, and ensure installs meet design standards, safety codes, and labeling policy. * Serve as the primary on-site technical point of contact for the Low Voltage Contractor and internal engineering teams, and act as remote hands during deployment and validation. * Manage the LVC deployment schedule to milestones, coordinate access, material delivery, and staging with facility operations, and report progress and delays. * Run multi-stage QA inspections on rack placement, racking, cable routing, grounding, and labeling against the BoM and design documentation. * Conduct or oversee optical loss testing (OLTS), OTDR analysis, and insertion/return loss on all fiber links, and verify copper (Cat6a/Cat8) integrity with certified testers. * Act as the SME for fiber and structured cabling best practices (BICSI), generate final test reports, as-builts, and RCAs, and own closeout and handoff to operations.