Systems Administrator

Touchstone Energy Cooperative, Inc.
Carrollton, GA, United States
2 months ago

Role details

Contract type
Permanent contract
Employment type
Full-time (> 32 hours)
Working hours
Shift work

Tech stack

Microsoft Windows Active Directory Backup Devices Dynamic Host Configuration Protocol Domain Name System (DNS) Microsoft Exchange Server Hyper-V Microsoft Servers Microsoft SQL Server Windows Servers Windows PowerShell Microsoft SharePoint
+6 more
Virtualization Technology Microsoft InTune Information Technology Data Management Nutanix Vmware

Job description

The Systems Administrator is responsible for the design, implementation, maintenance, monitoring, and support of enterprise server, storage, virtualization, and Microsoft-based infrastructure systems. This position provides tier-two and tier-three technical services and supports business-critical applications to ensure the stability, security, and availability of Carroll EMC’s IT infrastructure.

Requirements

The following requirements are subject to possible modification to reasonably accommodate individuals with disabilities. Some requirements may exclude individuals who pose a direct threat or significant risk to the health and safety of themselves or other employees., * Bachelor’s Degree in Computer Science or equivalent experience with a minimum of five (5) years of progressive systems or infrastructure administration experience.

  • Strong proficiency in Microsoft Server environments (Windows Server 2016-2025).
  • Demonstrated experience administering Active Directory, Group Policy, DNS, and DHCP.
  • Experience managing Microsoft Exchange (on-prem and hybrid).
  • Experience administering Microsoft SQL Server including backups, restores, and maintenance.
  • Strong experience with Microsoft 365 Administration (Entra ID, Exchange Online, SharePoint, Teams, Intune).
  • Proficiency with VMware, Hyper-V, and Nutanix AHV virtualization platforms.
  • Experience with enterprise storage systems (SAN/NAS).
  • Proficiency in PowerShell scripting and automation.
  • Strong troubleshooting skills and ability to resolve complex infrastructure issues.
  • Excellent written and verbal communication skills.
  • Ability to maintain confidentiality of systems and data.
  • Require the ability to work overtime hours and during emergency situations.
  • Require the successful completion of Carroll EMC’s employment entrance examination and drug screen.
  • Require the ability to have and maintain a valid driver’s license.

About the company

Providing low-cost, safe and reliable electricity to western Georgia since 1936. Carroll EMC’s origins trace back to 1935 when the Rural Electrification Administration (REA) was established by President Franklin D. Roosevelt. This New Deal agency was created to bring the same comforts to rural Americans - such as electric lights to extend the day and electric motors to ease the daily workload - that city residents had been enjoying for nearly three decades. The rural desire for electricity was passionate, however the means elusive. Vast distances between homes and farms made extending electricity to rural areas costly, prompting city-based electric utilities to deem them unprofitable. The REA helped to bring electricity to rural America through electric cooperatives - private partnerships owned and controlled by the people they serve. By the end of 1936 nearly 100 electric cooperatives in 26 states had been formed. The Carroll Rural Electric Association (later changed to Carroll EMC) was among them. A young Carrollton attorney, Robert D. Tisinger, led the local march to bring light to the western Georgia countryside. He visited with local farmers and rural leaders to dr…um up interest. When an organizational meeting was held in August 1936, it attracted 400 to 500 people interested in forming and joining the proposed electric cooperative. With a $118,000 loan from the REA, construction commenced in March to erect the first 117 miles of a rural electric system to serve rural Carroll and Heard counties. Soon after the new cooperative flipped the switch to energize the first section of lines on July 31, 1937, 344 members stepped into the modern age. Show more Show less

Apply for this position

This job is hosted externally. Click below to view the full posting and apply.

Apply on touchstoneenergy.com

Good distractions

Talks and stories from around this role — technically off-topic, practically not.

3:28 min

Recognizing vital enterprise stability in legacy software development roles

Gunnar Grosch · Coffee With Developers

1:40 min

Managing containerized infrastructure with Podman Desktop

Cedric Clyburn Cedric Clyburn +1 · WWC 2025

1:32 min

Ensuring secure and reliable connectivity for remote employees

Kyle Daigle · Coffee With Developers

1:41 min

Parallels between cloud and legacy infrastructure lock-ins

Björn Stahl Björn Stahl · WWC 2024

1:34 min

Pivoting careers into specialized platform engineering roles

Xavier Portilla Edo · LIVE

3:46 min

The history of abstractions and hardware virtualization

Edoardo Dusi · LIVE

Videos

See all

Related articles

See all