Energy Marshall - Data Center Construction

Insight Global
Boydton, VA, United States
7 days ago
Apply on www.techcareers.com
Prepare application

Role details

Contract type
Permanent contract
Employment type
Full-time (> 32 hours)
Experience level
Expert
Experience required
5 years minimum
Compensation
$83,200.0 - $166,400.0
Working hours
Regular working hours

Tech stack

Computer Engineering Data Centers

Job description

Insight Global is seeking a Data Center Energy Marshall to work for one of our largest technology clients in the Charlotte, NC area. This person will be working in an assurance role that helps ensure the vendors and contractors energy isolation project meets the company’s policy requirements for the data center construction and commissioning efforts. This person will be in a critical role implementing learnings, providing consistency, and driving rigor into the energy isolation program. The Energy Marshal is a representative who oversees and assures the Authorizing Energy Marshal (GC) and supplemental vendor support comply with the overall Energy Isolation Program Management on a datacenter construction campus. In addition to responsibilities outlined under Energy Marshall, this candidate will also lead as Owner’s Mechanical, Electrical and Plumbing Construction Manager, including managing MEP Commissioning Issues.

Utilize SPS-101 Energy Isolation SPS and SPS-101 Energy Isolation Guidebook as the baseline and foundation of the Energy Isolation Program that is implemented throughout the campus and project.

Oversees and assures the overall compliance of the Energy Isolation Program and establish acceptance criteria for authorizing campus Energy Isolation Plan.

Utilise local code and standards as the foundation for the Energy Isolation program that is implemented throughout the campus.

Establish with the Engineering team a centralized Lockout Tag Out (LOTO) procedure with all campus entities and determine if a group or individual LOTO procedure will be required.

Commencement of energy isolation activities with updates on a continuous basis.

Act in coordination with the Engineering team as a subject matter expert in all energy isolation incident investigations in area of responsibility

Participate in high-risk activity (HRA) planning meetings associated with energy isolation.

Ensures high-risk SOWs, SOPs and MOPs are reviewed, and all sources of energy are identified

Requirements

Bachelor’s degree in Electrical Engineering, Computer Engineering, or related field

10+ years of experience within Commerical Construction

Previous Data Center/Hyperscaler Experience

5+ years of technical engineering experience

Experience in critical environment and industry standards and practices

Ability to interpret line drawings and system redundancies to ensure design of LOTO systems is 100% effective and in compliance

Experience in the Control of Hazardous Energy in complex mission critical infrastructure

Experience with the operation and maintenance of building MEP systems. (Power distribution, lighting, grounding, fire alarm, security, life safety, controls systems and sprinkler systems)

Understanding of electrical theory and practical application via your maintenance & operation of critical electrical equipment. (Paralleling switchgear, redundant UPS systems, DC battery strings, multi-source electrical utility switchgear, standby diesel generators, etc.)

Knowledge of construction techniques, terminology, and documentation (blueprints, electrical one-lines, construction drawings etc.)

Practical experience with building management systems and automation, controls & frameworks.

Apply for this position

This job is hosted externally. Click below to view the full posting and apply.

Apply on www.techcareers.com
Prepare application

Good distractions

Talks and stories from around this role — technically off-topic, practically not.

2:22 min

Leveraging unique cultural backgrounds in engineering design

Ixchel Ruiz · LIVE

2:14 min

Overcoming age and background to study engineering

Anna John · World Congress 2023

51 sec

Repurposing hardware and operating underwater data centers

Chris Heilmann Chris Heilmann +1 · LIVE

1:20 min

Identifying multi-disciplinary talent for developer experience engineering roles

Hazal Mestci +1 · Coffee With Developers

3:16 min

Early exposure to limited hardware and open source

Thomas Dohmke Thomas Dohmke · World Congress 2022

4:03 min

Managing massive power consumption scaling in AI data centers

Stephan Gillich Stephan Gillich +3 · World Congress 2024

Videos

See all

Related articles

See all