Scheduling Manager (Owner's Representative) - Data Center Construction - Remote

KALCON LLC
Dallas, TX, United States
7 days ago
Apply on www.indeed.com
Prepare application

Role details

Contract type
Permanent contract
Employment type
Full-time (> 32 hours)
Experience level
Expert
Experience required
7 years minimum
Compensation
$150,000.0 - $200,000.0
Working hours
Regular working hours
Job source

Tech stack

Microsoft Word Microsoft Excel Analysis of Variance (ANOVA) Microsoft Outlook Data Centers Monte Carlo Methods Microsoft PowerPoint Primavera Resource Loading Tools for Reporting

Job description

Schedule Development and Standards

  • Help establish and maintain repeatable scheduling frameworks, templates, coding structures, calendars, milestone standards, and reporting
  • Contribute to planning and sequencing activities from concept through design, procurement, construction, startup, commissioning, and
  • Define or review activities, scope, durations, logic, interfaces, calendars, constraints, and resource loading as
  • Standardize Level 1 and Level 2 milestones to support comparison across projects and validate that constraints are used only where
  • Develop policies, procedures, and user training for internal and external scheduling

Independent Schedule Audit and Analysis

  • Independently audit general contractor Primavera P6 schedules and XER files for accuracy, completeness, logic, and conformance with contractual requirements and ǪII
  • Perform baseline and progress audits at least monthly and focused audits following contractor updates or at ǪII’s
  • Run DCMA schedule-quality checks and compare current updates against the contractual baseline and prior reporting
  • Review critical and near-critical paths, parallel activities, multiple float paths, constraints, calendars, open ends, lags, out-of-sequence progress, and logic
  • Identify variance drivers, schedule risks, unrealistic assumptions, and opportunities for corrective or recovery
  • Perform time-impact analyses, delay and claims analyses, schedule variance analyses, and schedule-risk scenarios, including Monte Carlo analysis where

Progress, Milestone and Risk Reporting

  • Track and report critical milestones, forecast dates, float erosion, slippage, recovery commitments, and schedule
  • Track OFCI manufacturing and delivery dates, vendor startups, commissioning activities, and owner-direct work and highlight problem
  • Validate schedule progress through coordination with field personnel, superintendents, contractors, vendors, and supporting
  • Develop clear schedule reports, narratives, variance explanations, and decision-ready recommendations for project and executive
  • Translate schedule sequences into PDF drawings or other visual workflows when useful for planning and

Requirements

  • Bachelor’s degree in Construction Management, Engineering, Project Management, Architecture, Business, or a related field preferred.
  • 7+ years of experience in construction scheduling, project controls, project management, or related project planning functions.
  • Experience supporting commercial, industrial, mission-critical, data center, healthcare, manufacturing, energy, or large-scale infrastructure construction projects.
  • Advanced proficiency in Primavera P6, including schedule development, maintenance, analysis, and schedule auditing.
  • Experience reviewing contractor schedules, CPM schedules, baseline schedules, recovery schedules, and schedule updates.
  • Strong understanding of Critical Path Method (CPM) scheduling principles, schedule logic development, resource loading, float analysis, constraints management, and schedule forecasting.
  • Experience performing schedule audits, schedule variance analysis, delay analysis, time impact analysis, and schedule recovery assessments.
  • Familiarity with DCMA Schedule Assessment metrics and schedule quality analysis methodologies.
  • Ability to review and analyze design, procurement, construction, commissioning, and turnover activities within integrated project schedules.
  • Experience supporting project controls processes, including schedule reporting, risk analysis, forecasting, and executive-level reporting.
  • Strong proficiency with Microsoft Excel, Word, PowerPoint, Outlook, Teams, and schedule reporting tools.
  • Ability to interpret construction drawings, specifications, contracts, procurement plans, and technical project documentation.
  • Excellent analytical, organizational, and problem-solving skills with strong attention to detail.
  • Strong written and verbal communication skills with the ability to present schedule data and recommendations to project teams, contractors, clients, and executive leadership.
  • Ability to manage multiple projects and priorities in a fast-paced environment.

Benefits & conditions

  • Medical insurance
  • Dental Insurance
  • Vision Insurance
  • Life Insurance
  • Accident Insurance
  • Long Term Disability
  • 401(k) retirement plan with 4% KALCON match when an employee contributes at least 5%
  • 15 days of paid time off
  • 8 paid National Holidays
  • Reimbursement for professional licenses and certifications

Submission Requirements:

At a minimum, the candidate’s professional resume must include the following:

  • List of all Educational Achievements
  • List of all Professional Licenses or Certificates
  • List of Awards Received
  • Detailed Employment History with each company including:
  • Name & Contact Information of the firm or agency
  • Start Date and End Date (Month & Year)
  • Positions Held

Apply for this position

This job is hosted externally. Click below to view the full posting and apply.

Apply on www.indeed.com
Prepare application

Good distractions

Loading talks and stories from around this role…